The calculation of current in a three phase system has been brought up on our site feedback and is a discussion I seem to get involved in every now and...
Per unit fault calculations is a method whereby system impedances and quantities are normalised across different voltage levels to a common base. By removing...
myElectrical does not support or promote the use of copyrighted material without the copyright owner's consent. If you believe that material for which...
I was reminded of Occam's Razor while reading a book. It's quite a simple principal of logic which has stood the test of time and is accepted as central...
Variable frequency drives are widely used to control the speed of ac motors. This note looks at the mechanisms which enable drive units to control the...
The European Union is implementing a voluntary code of practice for participants with the aim of improving the overall efficiency of data centres. As part...
Power cables can basically be classified into earthed and unearthed cables, where earthed and unearthed refer to the application for which the cable is...
The term 'N+1' relates to redundancy and simply means that if you required 'N' items of equipment for something to work, you would have one additional...
One of the requirements to ensuring that everything works is to have equipment selected, manufactured and verified [tested] to IEC standards. Not all equipment...
Our question and answer system while letting you do exactly what it says, is much more. It is a dynamic user driven system, where our users not only ask...
If you have some expert knowledge or experience, why not consider sharing this with our community.
By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.
To get started and understand our policy, you can read our How to Write an Electrical Note.