Are We Losing Professional Integrity
I have been thinking recently that there appears to be less professional integrity around than when I first started my career in electrical engineering...
IEC 60287 Current Capacity of Cables - An Introduction
IEC 60287 "Calculation of the continuous current rating of cables (100% load factor)" is the International Standard which defines the procedures and equations...
1,000 kV UHV First for China
At the beginning of the year China put the world's first 1,000 kV UHV transmission system into operation. Transmitting power at over a million volts is...
Fire Resistant and Fire Retardant Cables
Fire resistant and fire retardant cable sheaths are design to resist combustion and limit the propagation of flames. Low smokes cables have a sheath designed...
Contribute to myElectrcial
Have an opinion or something to say, want to ask or answer questions, share your knowledge then use our site to do it . As a community of people interested...
Tip – Latitude and Longitude on Large Scale Plans
If you are working on a large plan, get the real coordinates [latitude, longitude] for two or more points and add them to the drawing. That way you can...
Understanding LV Circuit Breaker Fault Ratings
I think this post is going to be helpful to several of our readers. While the IEC low voltage circuit breaker Standard [IEC 60947-2, Low voltage switchgear...
Fault Calculation - Symmetrical Components
For unbalance conditions the calculation of fault currents is more complex. One method of dealing with this is symmetrical components. Using symmetrical...
E-Ink
Before the technical, some general information. E-ink display are found in a lot of e-readers, some mobile phones and similar devices and the intent is...
Load Flow Study – how they work
A load flow study is the analysis of an electrical network carried out by an electrical engineer. The purpose is to understand how power flows around...