If you want to check a circuit is dead (not live), you should always use the three point method. First check a known live circuit, then check the dead...
Various arguments exist around SF6 Gas Insulated (GIS) and Air Insulated (AIS) medium voltage switchgear. Recently we had to change a GIS design to AI...
If you are working on a large plan, get the real coordinates [latitude, longitude] for two or more points and add them to the drawing. That way you can...
We have a sister note to this (Robots - Interesting Video), in which I have posted some videos of interesting robots developed by commercial corporations...
ABB has produced a range of technical guides that offer concise explanations of the major technologies and technical issues in low voltage AC drives. ...
Working in the vicinity of electrical equipment poses an hazard. In addition to electric shock hazard, fault currents passing through air causes Arc Flash...
Power cables can basically be classified into earthed and unearthed cables, where earthed and unearthed refer to the application for which the cable is...
One of the fundamental requirements of an alternating current distribution systems it to have the ability to change the magnitude of voltages. It is more...
When current flows within a wire, a magnetic field is created. The potion of this magnetic field perpendicular to the wire is called the magnetic flux...
The 27 km, Euro 6 billion Collider lies on the border between France and Switzerland, took nearly 30 years to complete. Some of the lofty goals for the...
If you have some expert knowledge or experience, why not consider sharing this with our community.
By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.
To get started and understand our policy, you can read our How to Write an Electrical Note.