The (relatively new) switchgear and control gear standard, IEC 61439 'Low-voltage switchgear and controlgear assemblies' has three methods which can be...
One of the requirements to ensuring that everything works is to have equipment selected, manufactured and verified [tested] to IEC standards. Not all equipment...
Circuit breakers are switching devices whose primary function is to isolate parts of an electrical distribution system in the even of abnormal conditions...
The calculation of current in a three phase system has been brought up on our site feedback and is a discussion I seem to get involved in every now and...
Our question and answer system while letting you do exactly what it says, is much more. It is a dynamic user driven system, where our users not only ask...
Three phase systems are derived from three separate windings, either connected in delta or star (wye). Each winding can be treated separately, leading...
Per unit fault calculations is a method whereby system impedances and quantities are normalised across different voltage levels to a common base. By removing...
Lead acid batteries are cost effect and reliable, making them suitable for many applications.This note examines topics of interest associated with the...
Our cable sizing tool is one of the more popular tools on the site. The tool enables cables to be sized in compliance with BS 7671 (the IEE Wiring Regulations...
Over the past year or so I've been involved in on going discussions related to referring fault levels from the secondary of a transformer to the primary...
If you have some expert knowledge or experience, why not consider sharing this with our community.
By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.
To get started and understand our policy, you can read our How to Write an Electrical Note.