Installation of a UPS can help in reducing problems due to issues with the power supply. A lot of people relate this to nine key issues. Depending on...
If you are working on a large plan, get the real coordinates [latitude, longitude] for two or more points and add them to the drawing. That way you can...
When sizing cables nearly, everyone uses some form of software. This ranges from homespun spreadsheets to complex network analyses software. Each has its...
In three phase systems, the use of transformers with three windings (or legs) per side is common. These three windings are often connected in delta or...
Various arguments exist around SF6 Gas Insulated (GIS) and Air Insulated (AIS) medium voltage switchgear. Recently we had to change a GIS design to AI...
If you are wondering what happened to our cable notes, the short answer is that we have moved them to myCableEngineering.com. The "Knowledge Base" at...
The correct sizing of current transformers is required to ensure satisfactory operation of measuring instruments and protection relays. Several methods...
IEEE TV has a part series of videos on wind power and it's implication. For a really good overview to the technologies and issues around wind power, these...
I've been considering a blog on the 110 or 230 Volt issue for a while. While browsing the Internet I came across a great summary by Borat over at engineering...
A lot of our members work in countries where PPE (personal protective equipment) is regulated or they work for companies/organizations which take employee...
If you have some expert knowledge or experience, why not consider sharing this with our community.
By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.
To get started and understand our policy, you can read our How to Write an Electrical Note.