Electrical and related buildings technology
The (relatively new) switchgear and control gear standard, IEC 61439 'Low-voltage switchgear and controlgear assemblies' has three methods which can be...
Often document control is dictated by project requirements, for example a particular organisation may have an existing numbering system. Existing company...
The IET site has a video of a visit showing of a high tech meeting room developed at Napier University in Edinburgh. It a good demonstration of innovative...
Many questions sent in to the site are in connection with motor starting and in particular star-delta. For all but the simplest application, there is...
The 27 km, Euro 6 billion Collider lies on the border between France and Switzerland, took nearly 30 years to complete. Some of the lofty goals for the...
The robot folding towels post below was interesting enough at the time to post a link. Recently I’ve come across a couple of other interesting videos...
One of the requirements to ensuring that everything works is to have equipment selected, manufactured and verified [tested] to IEC standards. Not all equipment...
The windings of many medium and small sized transformers are protected by restricted earth fault (REF) systems. The illustration shows the principal of...
Exposure to time varying magnetic fields, from power frequencies to the gigahertz range can have harmful consequences. A lot of research has been conducted...
Within Europe the European Committee for Electrotechnical Standardization (CENELEC) has standardised the both the designation and colour of cables. ...
If you have some expert knowledge or experience, why not consider sharing this with our community.
By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.
To get started and understand our policy, you can read our How to Write an Electrical Note.