UPS Sizing - Rules of Thumb 

By on

Not so long ago I was telling someone that I don't use rules of thumb as most things are easily calculated anyhow.   As it turns out last week I ended up sizing some UPS using what can only be described as rules of thumb.   In deference to my change of heart here are my UPS sizing rules of thumb.

First rule; kW and kVA are related by 0.8.  This does not apply to all UPS, but it does for many (and is the worse case).  People often get confused with what this means, so I'll try to explain it a little.  Each UPS has a maximum kW and kVA it can deliver (related by 0.8), for example a 100 kVA UPS can deliver a maximum of 100 kVA or maximum of 80 kW.  Some examples will make this more clear (assuming a 100 kVA, 80 kW UPS):

  • load is 80 kW at 0.7 power factor = 114 kVA - exceeds maximum kVA
  • load is 80 kW at o.8 power factor = 100 kVA - UPS is good
  • load is 80 kW at 0.9 power factor = 88 kVA - UPS is good
  • load is 100 kVA at 0.7 power factor = 70 kW - UPS is good
  • load is 100 kVA at 0.8 power factor = 80 kW - UPS is good
  • load is 100 kVA at 0.9 power factor = 90 kW - exceeds maximum kW

Some people work in kVA, but I always choose to work in kW.  kW is the measure of power used by the equipment and it make sense to me to use that. It can also be added arithmetically to give a technically correct answer (kVA cannot as it is a vector quantity). Once I have the final load kW, divide by 0.8 to get the kVA and select the next largest standard UPS size.

I used to size UPS systems to run at full capacity.  Many individuals and institutions like to limit the loading on a UPS to 90% of it's rated full load current.  After much arguing I have decided to hold my hand up, surrender and follow the same rule. Given a load requirement in kW, I divide by 0.9 (90% rule) to get the kW to size the UPS.

The charging of batteries (if discharged) and losses/efficiency of the UPS itself mean that input power to the UPS is larger than the output.   UPS units are invariably rated on output power and this needs to be adjusted to determine the loading on the supply system.  Typically allowing 20% for battery charging and UPS losses is a good approach - more than required, but not excessively so. 

Finally in larger installations the above is combined with the black art of selecting the correct size and number units.  Space, cost, redundancy, etc. all affect the final selection.  Is a single 300 kVA UPS better or worse than two 150 kVA units.  How do two 300 kVA units in N+1 redundancy compare with three 150 kVA units in N+1 redundancy. When selecting the UPS for larger installation it can be difficult.  Unfortunately I don't have any rules for this.  I try to look at the system as a whole (power to the UPS, how the UPS power is to be distributed, redundancy requirements, etc.) and put a few configurations on paper. As these are developed into a workable concept one of the options tends to become the obvious one to choose.

Example

Finally here is an example of how the selection may go:

  • requirements - 166 kW of UPS load, N+1 redundancy required
  • selection - 90% rule requires 184 kW which at 0.8 = 230 kVA

Some options would include 2x250 kVA or 3x120 kVA or 4x80 kVA (each giving N+1 redundancy).   The later options require more units but results in less installed UPS kVA (cost would likely be comparable).  I generally prefer smaller units as they are easier to handle/move around, and in this instance I would be tempted to select the 3x120 kVA option.  I think the 4x80 kVA option would be pushing the boundary; while it still maintains N+1, the chance of one of four failing is greater than one of three (taken to extreme 23x10 kVA units is obviously not feasible).     

Summary

As the example shows, the rules of thumb (90% and 20%) give a required kW on which to base UPS selection and input power to the UPS.  kW and kVA are related by 0.8.   In larger installations there is no right or wrong selection of the size and number of UPS units.  Different engineers will likely arrive at different, but still workable solutions.   This mixture of experience and engineering art is not dependant on decimal accurate figures and values obtained by using simple rules of thumb are generally sufficient. 

Related Links



Steven McFadyen's avatar Steven McFadyen

Steven has over twenty five years experience working on some of the largest construction projects. He has a deep technical understanding of electrical engineering and is keen to share this knowledge. About the author

myElectrical Engineering

comments powered by Disqus

  1. Notes's avatar Notes says:
    8/21/2013 3:21 PM

    Trackback from Notes

    A UPS is an uninterruptible power supply.  It is a device which maintains a continuous supply of electrical power, even in the event of failure of the mains (utility) supply.  A UPS is installed between the mains supply and the equipment to be protected... ...


Comments are closed for this post:
  • have a question or need help, please use our Questions Section
  • spotted an error or have additional info that you think should be in this post, feel free to Contact Us



Bows and Arrows

It starts with me reading one of the Horrible History books with my son (Groovy Greeks). Arrows were mentioned which lead to the discussion of the bodkin...

How to Size Current Transformers

The correct sizing of current transformers is required to ensure satisfactory operation of measuring instruments and protection relays. Several methods...

How to Calculate Motor Starting Time

Request to look at induction motor starting time have come up a few times on the site. Hopefully in this post, I give you guys some idea on how to calculate...

Back to basics - the Watt (or kW)

When thinking about watts (W) or kilowatt (kW = 1000 W) it can be useful too keep in mind the fundamental ideas behind the unit. Watt is not a pure electrical...

Material Properties

Everything physical in electrical engineering from insulations to conductors revolves around materials. Here we are listing common materials along with...

Fire Resistant and Fire Retardant Cables

Fire resistant and fire retardant cable sheaths are design to resist combustion and limit the propagation of flames. Low smokes cables have a sheath designed...

Why a Sine Wave?

I received this question by email a few weeks. First thoughts was that it is a product of the mathematics of rotating a straight conductor in a magnetic...

8 Motor parts and common faults

Straight forward list of some common motor faults.  If I have missed any other common faults, please take a bit of time to add them in as a comment below...

Alternating Current Circuits

Alternating current (a.c.) is the backbone of modern electrical power distribution. In this article I’ll be pulling some of the more important concepts...

Load Flow Study – how they work

A load flow study is the analysis of an electrical network carried out by an electrical engineer. The purpose is to understand how power flows around...

Have some knowledge to share

If you have some expert knowledge or experience, why not consider sharing this with our community.  

By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.

To get started and understand our policy, you can read our How to Write an Electrical Note