Write your best report 

By on

Years ago I was told that you should always try to write the best report you can.  Many years later I still think on this as one of the better pieces of advice.  Not only does this apply to reports, but also to drawings, proposals, project plans etc.; in fact anything which is going to be read, reviewed or seen by people. 

The report is the final deliverable that our peers, boss and clients will see.  These people don't see all the work which has been put into researching,  analyzing, calculating, discussing or the time and effort involved in getting everything ready for the report.  They only see the report.  If it doesn't grab their attention and keep it then all the background work has been for nothing.

Often people spend will vast amounts of time working through the issues which will support the report and then only a limited time producing the report.  If anything it could be argued that it should be the other way around.  Like a lot of people I'm not a great fan of report writing but when I have to produce a report I keep reminding myself of the above. 



Steven McFadyen's avatar Steven McFadyen

Steven has over twenty five years experience working on some of the largest construction projects. He has a deep technical understanding of electrical engineering and is keen to share this knowledge. About the author

myElectrical Engineering

comments powered by Disqus



Fault Calculation - Symmetrical Components

For unbalance conditions the calculation of fault currents is more complex. One method of dealing with this is symmetrical components. Using symmetrical...

Large Hadron Collider

The 27 km, Euro 6 billion  Collider lies on the border between France and Switzerland, took nearly 30 years to complete.  Some of the lofty goals for the...

DC Component of Asymmetrical Faults

The image (reproduced from IEC 60909) shows a typical fault in an ac system.  From the illustration it can seen that there is an initial dc component ...

How to Check a Circuit is Dead

If you want to check a circuit is dead (not live), you should always use the three point method. First check a known live circuit, then check the dead...

Battery Sizing

This article gives an introduction to IEEE 485 method for the selection and calculation of battery capacity.

Understanding Motor Duty Rating

One of the comments on my Motor Starting Series was asking for something on duty cycles. Here it is. As a purchaser of a motor, you have responsibility...

Cable Sizing Tool

Our cable sizing tool is one of the more popular tools on the site.  The tool enables cables to be sized in compliance with BS 7671 (the IEE Wiring Regulations...

Understanding Circuit Breaker Markings

IEC 60947 is the circuit breaker standard and covers the marking of breakers in detail. Any manufacturer following this standard should comply with the...

Tip – Latitude and Longitude on Large Scale Plans

If you are working on a large plan, get the real coordinates [latitude, longitude] for two or more points and add them to the drawing. That way you can...

Lightning Risk Assessment (IEC 62305)

IEC 62305 'Protection against lightning' requires a risk assessment be carried out to determine the characteristics of any lightning protection system...

Have some knowledge to share

If you have some expert knowledge or experience, why not consider sharing this with our community.  

By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.

To get started and understand our policy, you can read our How to Write an Electrical Note