Power systems theory - generation, transmissions and distribution
The term 'N+1' relates to redundancy and simply means that if you required 'N' items of equipment for something to work, you would have one additional...
GE's latest thinking on product manufacturing is he Shingijutsu philosophy or Lean production system. They have started applying this at the Louisville...
A load flow study is the analysis of an electrical network carried out by an electrical engineer. The purpose is to understand how power flows around...
When sizing cables, the heat generated by losses within any sheath or armour need to be evaluated. When significant, it becomes a factor to be considered...
Often document control is dictated by project requirements, for example a particular organisation may have an existing numbering system. Existing company...
This is the second post in a series of two on periodic electrical inspections. In the first post, I discussed how often inspections should be carried out...
One of the requirements to ensuring that everything works is to have equipment selected, manufactured and verified [tested] to IEC standards. Not all equipment...
This post is quick introduction and overview to different railway electrification voltages used in answer to a question sent in via email. While there...
I've recently come across this question a couple times browsing the internet. Decided to give a quick answer here. A rectifier transformer is a transformer...
The correct sizing of current transformers is required to ensure satisfactory operation of measuring instruments and protection relays. Several methods...
If you have some expert knowledge or experience, why not consider sharing this with our community.
By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.
To get started and understand our policy, you can read our How to Write an Electrical Note.