From the monthly archives: November 2011

We are pleased to present below all posts archived in 'November 2011'. If you still can't find what you are looking for, try using the search box.

How to Size Power Cable Duct

By Steven McFadyen on 11/24/2011 10:09 AM

Some colleagues had an issue earlier in the week on sizing conduits to be cast in concrete for some power cables . It became clear that none of us had a clear idea on an approved method. In the end w... read more..


How to Calculate Motor Starting Time

By Steven McFadyen on 11/15/2011 2:00 PM

Request to look at induction motor starting time have come up a few times on the site. Hopefully in this post, I give you guys some idea on how to calculate this. Failing that, hopefully at least som... read more..


Difference Between Live and Dead Tank Circuit Breakers

By Steven McFadyen on 11/11/2011 10:51 AM

A quick post in connection with an email question:

Live Tank - the circuit breaker the switching unit is located in an insulator bushing which is live at line voltage (or some voltage above g... read more..


How to Size Current Transformers

By Steven McFadyen on 11/7/2011 11:48 AM

The correct sizing of current transformers is required to ensure satisfactory operation of measuring instruments and protection relays. Several methods exist to size current transformers. This note will... read more..


How to Check a Circuit is Dead

By Steven McFadyen on 11/3/2011 4:46 AM

If you want to check a circuit is dead (not live), you should always use the three point method. First check a known live circuit, then check the dead circuit and finally recheck the live circuit. Carry... read more..




Voltage Drop in Installations - Concepts

Problems on achieving maximum voltage drop within an installation come up often. Depending where you live, local regulations will have different limits...

UPS - Uninterruptible Power Supply

A UPS is an uninterruptible power supply.  It is a device which maintains a continuous supply of electrical power, even in the event of failure of the...

Cables for MV Power Distribution - Earthed versus Unearthed Systems

Power cables can basically be classified into earthed and unearthed cables, where earthed and unearthed refer to the application for which the cable is...

1,000 kV UHV First for China

At the beginning of the year China put the world's first 1,000 kV UHV transmission system into operation. Transmitting power at over a million volts is...

3 Phase Loads

Three phase systems are derived from three separate windings, either connected in delta or star (wye). Each winding can be treated separately, leading...

8 Motor parts and common faults

Straight forward list of some common motor faults.  If I have missed any other common faults, please take a bit of time to add them in as a comment below...

Star-Delta Motor Starting - Performance

Many questions sent in to the site are in connection with motor starting and in particular star-delta.  For all but the simplest application, there is...

Tip – Latitude and Longitude on Large Scale Plans

If you are working on a large plan, get the real coordinates [latitude, longitude] for two or more points and add them to the drawing. That way you can...

Getting Started with Patents

If you have a great idea or invent something the last thing you want is someone to steal the idea. One of the things you can do is protect the intellectual...

Battery Sizing

This article gives an introduction to IEEE 485 method for the selection and calculation of battery capacity.

Have some knowledge to share

If you have some expert knowledge or experience, why not consider sharing this with our community.  

By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.

To get started and understand our policy, you can read our How to Write an Electrical Note