Electromechanical Relays 

By on

Electromechanical relays have been the traditional backbone of electrical protection systems. While over recent years these have been replaced by microprocessor based numerical devices, there are still many older electromechanical relays in service.

Evolution

Mechanical relays developed in the 1800s were the first form of electrical protection. While still being reliable and widely used these were superseded by static relays in the early 1980s. Static relays have no moving parts (hence the name) and operated on the basis of analogue circuitry. More recently static relays have been superseded by first digital relays and now numerical microprocessor based devices.

Tripping Curves

IEC 60255 Characteristics

IEC60255CurvesThe IEC 60255 standard defines four standard current time characteristics – standard inverse (SI), very inverse (VI), extremely inverse (EI) and long-time inverse.  Each characteristic can be calculated from:

IEC60255

where:

t       = tripping time in (S)

I       = fault (actual) secondary CT current (A)

Is     = relay pick-up current setting)

TMS = time multiplier setting

Characteristic α K
Standard Inverse 0.02 0.14
Very Inverse 1.0 13.5
Extremely Inverse 2.0 80
Long-time Inverse 1.0 120

Relay characteristics are sometimes classified according to the tripping time at 10 times the setting current (i.e. [3s/10] - a standard inverse curve which will trip in 3 seconds at 10 times the current setting). Tripping times for the various relays are:

Standard Inverse (SI) [3s/10] or [1.3s/10]
Very Inverse (VI) [1.5s/10]
Extremely Inverse (EI) [0.8s/10]
Long Time Standard Earth Fault [13.3s/10]

 

North American Characteristics

NorthAmericanCurvesCurrent time characteristics in North America as classified as IEEE Moderately Inverse, IEEE Very Inverse, IEEE Extremely Inverse, US C08 Inverse and US CO2 Short Time Inverse. These are given by:

NACurves

where:

t = tripping time in (S)

I = fault (actual) secondary CT current (A)

Is = relay pick-up current setting

TD = time dial setting (multiplier)

Characteristic α β K
IEEE Moderately Inverse 0.02 0.114 0.0515
IEEE Very Inverse 2.0 0.491 19.61
IEEE Extremely Inverse 2.0 0.1217 28.2
US CO8 Inverse 2.0 0.18 5.95
US CO2 Short Time Inverse 0.02 0.01694 0.02394

 

 

Setting Example (IEC 60255)

An 1000 Amp breaker protected by relay with Standard Inverse characteristic.  The relay pick-up current value is set at 0.8, time multiplier setting is 7 and the fault current is 8000 A.  What will be the tripping time?

  • - from the table α = 0.02, K = 0.14
  • - pick-up current setting = 1000 A x 0.8 = 800 A
  • - using the IEC 60255 equations, the tripping time is:

image001

 

We also have an online IDMT Tripping Time calculator.

CDG11/16 Curves

If you have the 3sec relay's trip curve, you can just multiply the time with 1.3 and divide the answer with 3. That is the time for the 1.3sec relay.

GEC / English Electric / Alstom /Areva

Labelling the model from left to right, using number CDG31 etc. 1=C, 2=D c=G etc.:

  1. operating quantity (C - current, D - differential, V- voltage)
  2. basic movement (D - induction disc, M - balanced armature, T - static)
  3. Application (G- general or generator, E - earth, U - definite time, F - flag, M - motor, D - directional)
  4. number of units (ie CDG3x is a 3 element / unit CDG relay)
  5. characteristic (for CDG, 1= std inverse (3s), 2= long time delay, 3=very inverse (1.55s), 4=extremely inverse (0.6s), 6=Long Time Standard Earth Fault)
  6. case size (15 different cases, A=size 1 draw out, 10 terminal etc.)
  7. case mounting (F=flush etc.)
  8. identification (identifies rating, contact arrangement etc. 2= 'metricated')
  9. suffix ('5' is for 50Hz only relays, '6' for 60Hz)

For a full list refer to publication MS/5100/2 from English Electric

The company history has changed over the last few years. English Electric became GEC and subsequently GEC-Alstom. Recently the company has now been acquired by Areva.

example - CDG 34EG0022A5 is a current operated, induction disc general relay, with three extremely inverse elements and is a 50 Hz unit.

Stabilising Resistors

If current transformers are connected in a residual circuit, saturation of one or more of the transformers during transient events may result in large spill currents. Particularly with high impedance relays, this may cause the the relay to falsely operate. To achieve stability under these conditions, stabilising resistor|resistors are added to increase the minimum relay operating voltage.

Rule of thumb for sizing of resistor:

try to drop: myElectrical Equation  at myElectrical Equation,

that is:

myElectrical Equation

Where:
R     = stabilising resistor value
Vk    = knee voltage of CT
Ipk    = relay pickup current

 

Alternatively the stabilising resistor can be calculated by using:

myElectrical Equation

where:
VA    = relay burden 
 Ir    = relay setting current

Note: The power rating of the stabilising resistor should be chosen taking into consideration the expected magnitude and duration of the current through the resistor.



Steven McFadyen's avatar Steven McFadyen

Steven has over twenty five years experience working on some of the largest construction projects. He has a deep technical understanding of electrical engineering and is keen to share this knowledge. About the author

myElectrical Engineering

comments powered by Disqus

  1. Joby Mathew's avatar Joby Mathew says:
    12/8/2012 9:45 AM

    Can you please answer
    1000A ACB is set at 0.8 current and 0.7 time multiplier setting in a 10time 3sec delay, what will be the tripping time if 8000A current flows ???

  2. Steven's avatar Steven says:
    12/9/2012 1:25 PM

    Joby,

    I've added an example to the post using your values and also a new calculation tool (see the example for the link).

    Let me know if you see anything wrong.

  3. Jorge's avatar Jorge says:
    5/29/2013 2:25 PM

    Hello Mr.

    Im having some trouble to understand the exact terms i have to put in the form. If i have a relay with 1000A Iprimary and 1 A as Isecondary, and i establish a pickup I of 7A (7 times my In thats is 1A), and then i inject 8 A trough the relay in the secondary.
    What shall i put in the form? (8/7)^0.02...?
    If i do so i get 5, 24 sec of trip, and im doing the test physically and the machine indicates 2,01 sec.
    So im putting something wrong in the form.

    Cheers


Comments are closed for this post:
  • have a question or need help, please use our Questions Section
  • spotted an error or have additional info that you think should be in this post, feel free to Contact Us



Always Use PPE

A lot of our members work in countries where PPE (personal protective equipment) is regulated or they work for companies/organizations which take employee...

Why a Sine Wave?

I received this question by email a few weeks. First thoughts was that it is a product of the mathematics of rotating a straight conductor in a magnetic...

Fire Resistant and Fire Retardant Cables

Fire resistant and fire retardant cable sheaths are design to resist combustion and limit the propagation of flames. Low smokes cables have a sheath designed...

Lightning Protection and Earth Electrode Resistance

Most installations involve some form of lightning protection system which is connected to an earth electrode.  The function of the earth electrode is to...

Differential protection, the good old days

This morning I was explaining how differential protection works to a junior engineer. To give him something to read I opened up the NPAG (Network Protection...

What are you reading!

Reading is a bit of a hobby of mine and I"ve done a few off-topic posts in the past on this. Rather than continue doing the occasional post I thought ...

Three Phase Power Simplified

A single phase system is perhaps the most common type of system most people are familiar with. This is what people have in their homes and what appliances...

Multimeter

Multimeters are undoubtedly the most common item of electrical test equipment in use.  Often it is the first piece of equipment people will turn to when...

Understanding LV Circuit Breaker Fault Ratings

I think this post is going to be helpful to several of our readers. While the IEC low voltage circuit breaker Standard [IEC 60947-2, Low voltage switchgear...

ANSI (IEEE) Protective Device Numbering

The widely used United Sates standard ANSI/IEEE C37.2 'Electrical Power System Device Function Numbers, Acronyms, and Contact Designations' deals with...

Have some knowledge to share

If you have some expert knowledge or experience, why not consider sharing this with our community.  

By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.

To get started and understand our policy, you can read our How to Write an Electrical Note