IEC Document Designation 

By on

Often document control is dictated by project requirements, for example a particular organisation may have an existing numbering system. Existing company or group/department document control systems may also be employed. In the absence of any agreed document control, it is recommended that the system detailed in IEC 61355 be followed.

IEC 61355 Document Designation

The IEC 61355 standard provides rules and guidelines for the classification of documents based on their characteristic content for all technical areas which are in use during the life cycle of a plant, system or equipment.

document - fixed and structured amount of information intended for human perception that can be managed and interchanged as a unit between users and systems

DCC - document classification code

A document designation combines a designation of the object to which the document is assigned and the DCC together with a counting number. The document counting number has no meaning other than to differentiate different documents. In addition, this document designation may be supplemented by a page counting number.

 

IEC61355DocumentDesignation

 

The object designation shall unambiguously specify the object to which a document is assigned. This implies that an object designation shall be (or be made) unambiguous in a specified context. The DDC consists of the prefix sign "&" (ampersand) followed by a code consisting of three letters:

· A1 - letter code for technical area
· A2 - represents class level A2
· A3 - represents class level A3

The page counting number is optional. It shall be separated from the document designation part by the character "/" (solidus), which may be omitted if no confusion is likely (or example when the page counting number is shown in a separate section in the title block ).

It should be noted that within any particular organisation, it is not necessary to implement the full document designation.  In particular the DDC could be incorporated as part of an existing document numbering scheme.

IEC 61355 Data Base

The IEC maintain an up to date (and evolving) online database of DDC designations:

IEC 61355 Online Database - as of May 2012, the database did allow free pubic access

The database lists Application Areas (A1 in the DDC) and Activity Areas (A2A3 in the DDC).  In order to facility finding the correct DDC, the database allows searching for documents and listing in different formats (by application area, activity area, presentation form, etc.).

Example – to find a DDC for a single line diagram you can search the data base by application area. For electrical engineering the application area (A1) is identified as 'E'.  Expanding the list and selecting overview diagrams, show the activity area (A2A3) as 'FA'.  The description and examples confirm this is the correct designation to be applied to Single Line Diagrams.  The full DDC is then EFA.

See Also

IEC Reference Designations – Opinion post on object designations



Steven McFadyen's avatar Steven McFadyen

Steven has over twenty five years experience working on some of the largest construction projects. He has a deep technical understanding of electrical engineering and is keen to share this knowledge. About the author

myElectrical Engineering

comments powered by Disqus



IEC 60287 Current Capacity of Cables - Rated Current

In the previous note we looked at the approach taken by the standard to the sizing of cables and illustrated this with an example.  We then looked at one...

UPS Battery Sizing

Various techniques exist to enable the correct selection of batteries for UPS applications.  The procedure described below is one of the more common. ...

Lighting - Lamps

Lamps are the essential part of any luminaire. These are the light generating components. Since the advent of electrical lighting in the middle of the...

IEEE Winds of Change

IEEE TV has a part series of videos on wind power and it's implication. For a really good overview to the technologies and issues around wind power, these...

Alternating Current Circuits

Alternating current (a.c.) is the backbone of modern electrical power distribution. In this article I’ll be pulling some of the more important concepts...

Load Flow Study – how they work

A load flow study is the analysis of an electrical network carried out by an electrical engineer. The purpose is to understand how power flows around...

How to Write an Electrical Note

Electrical notes are a collaborative collection of electrical engineering information and educational material. Any registered user can add content. ...

DC Component of Asymmetrical Faults

The image (reproduced from IEC 60909) shows a typical fault in an ac system.  From the illustration it can seen that there is an initial dc component ...

UPS Sizing - Rules of Thumb

It wasn't so long ago I was telling someone that I don't use rules of thumb as most things are easily calculated anyhow.   As it turns out I last week...

Power Factor

Power factor is the ratio between the real power (P in kW) and apparent power (S in kVA) drawn by an electrical load. The reactive power (Q in kVAr)...

Have some knowledge to share

If you have some expert knowledge or experience, why not consider sharing this with our community.  

By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.

To get started and understand our policy, you can read our How to Write an Electrical Note