Understanding Motor Duty Rating 

By on

One of the comments on my Motor Starting Series was asking for something on duty cycles.  Here it is. 

As a purchaser of a motor, you have responsibility to let the manufacturer know the anticipated duty of the motor.  To assist in the communication of this information, the standard IEC 60034-1 (Rotating electrical machines) defines several duty characteristics, denoted S1 to S10:

S1  Continuous duty The motor operates at a continuous load for sufficient time to enable machine to reach thermal equilibrium. 
S2 Short Time duty Operation at a load for a time not sufficient to reach thermal equilibrium, followed by enough time for the motor to cool down.
S3  Intermittent periodic duty
Series of identical duty cycles each a constant load for a period, followed by a rest period. Thermal equilibrium is not reached during the cycle.
S4 Intermittent periodic duty with starting Similar to S3, but there is a significant starting time within the periodic operation.
S5 Intermittent periodic duty with electric braking Sequence of identical duty cycles - starting, operation, braking and rest.  Again thermal equilibrium is not reached.
S6 Continuous operation periodic duty Identical duty cycles with a period at load followed by a period at no load.  Difference between S1 is that the motor runs at no-load, without actual stopping.
S7 Continuous operation periodic duty with electric braking As per S6, but with a significant starting and electric breaking periods.  Again motor operates at no-load for  period instead of stopped. 
S8 Continuous operation periodic duty with related load/speed changes Series of identical repeating duty cycles, where within each cycle the motor operates at several different load levels and speed. There is not stopped time and thermal equilibrium is not reached.
S9 Duty with non-periodic load and speed variations     Load and speed vary periodically within the permissible operating range. Frequent overloading may occur.
S10 Duty with discrete constant loads and speeds Duty with discrete number of load/speed combinations, with these maintained long enough to reach thermal equilibrium.
     

 

Thermal Equilibrium is the state reached when the temperature rise of the machine does not vary by more than 2K per hour.   If you don't specify the duty cycle, the manufacturer will likely assume S1. Click on the image to see a larger version, illustrating the duty cycles.

If anyone has anything to add, please do so below. 



Steven McFadyen's avatar Steven McFadyen

Steven has over twenty five years experience working on some of the largest construction projects. He has a deep technical understanding of electrical engineering and is keen to share this knowledge. About the author

myElectrical Engineering

comments powered by Disqus

  1. sabari nath's avatar sabari nath says:
    5/24/2013 7:51 AM

    Can you help me understand the relation between Motor duty cyce and Starts per hour?


Comments are closed for this post:
  • have a question or need help, please use our Questions Section
  • spotted an error or have additional info that you think should be in this post, feel free to Contact Us



Back to Basics - Ohm’s Law

Electrical engineering has a multitude of laws and theorems. It is fair to say the Ohm's Law is one of the more widely known; it not the most known. Developed...

Microsoft OneNote

A couple of months ago I came Microsoft's OneNote and downloaded the 60 day free trail. Since then I have been using it regularly and now have a full license...

Cables for MV Power Distribution - Earthed versus Unearthed Systems

Power cables can basically be classified into earthed and unearthed cables, where earthed and unearthed refer to the application for which the cable is...

Photovoltaic (PV) Panel - Performance Modelling

In an earlier note on the site [Photovoltaic (PV) - Electrical Calculations], the theory of solar (PV) cell calculations was introduced.  In particular...

IEC 60287 Current Capacity of Cables - An Introduction

IEC 60287 "Calculation of the continuous current rating of cables (100% load factor)" is the International Standard which defines the procedures and equations...

Always Use PPE

A lot of our members work in countries where PPE (personal protective equipment) is regulated or they work for companies/organizations which take employee...

Photovoltaic (PV) - Utility Power Grid Interface

Photovoltaic (PV) systems are typically more efficient when connected in parallel with a main power gird. During periods when the PV system generates energy...

Low Voltage Fault Tables

The following tables provide quick order of magnitude fault levels for a a range of typical low voltage situations.

IEC Reference Designations

The IEC publishes a series of documents and rules governing the preparation of documents, drawings and the referencing of equipment.   Depending on country...

Contribute to myElectrcial

Have an opinion or something to say, want to ask or answer questions, share your knowledge then use our site to do it . As a community of people interested...

Have some knowledge to share

If you have some expert knowledge or experience, why not consider sharing this with our community.  

By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.

To get started and understand our policy, you can read our How to Write an Electrical Note