Periodic Electrical Installation Inspection – How Often? 

By on

periodicInspectionsInspection of electrical installations on a periodic basis is essential to ensure the continued safety and reliability of such installations.

How often installations are inspected is up to the owner of the installation, provided such durations do not exceed any regulatory maximums in force. The criticality of the electrical installation to the continuation of the business, often determines how frequently the installation is inspected, for example many banks will carry out annual inspections of their installations. Other types of enterprise may do inspections more frequently and many installations are only inspected as often as required by regulation.

It is also possible, that different parts of an electrical installation are inspected with varying periods. Critical systems may be inspected more often than non-critical systems.

Depending where you live, it is likely that electrical installation regulations will exist, which will state the maximum duration allowable between inspections. For example in the IEE Wiring Regulations in the UK and the National Electric Code in the US, both deal how long an installation can be left without being inspected.

As an example in the UK, IEE Guidance Note 3, Inspection & Testing contains a table which gives the maximum allowable periods between inspections - offices, residential accommodation five years, leisure complexes, theatres three years, marinas, swimming pools one year, … , etc.

Now that the when has been covered, my second post will look at what should be inspected:

Periodic Electrical Installation Inspection – What to Inspect?



Steven McFadyen's avatar Steven McFadyen

Steven has over twenty five years experience working on some of the largest construction projects. He has a deep technical understanding of electrical engineering and is keen to share this knowledge. About the author

myElectrical Engineering

comments powered by Disqus

  1. Eurotechworld's avatar Eurotechworld says:
    6/7/2012 7:11 PM

    It is wonderful information and very helpful in business. Thanks for shearing this topic friend.

    Third Party Inspection


Comments are closed for this post:
  • have a question or need help, please use our Questions Section
  • spotted an error or have additional info that you think should be in this post, feel free to Contact Us



Voltage Levels to IEC 60038

The standard aims to consolidate AC and traction voltages within the industry and defines the following bands: band 1 - A.C. systems 100 V to 1...

Post Editing Tips

If you at all familiar with programs like office and outlook, then adding and editing posts is pretty straightforward and intuitive.  However, there are...

Battery Cars A to Z

Battery powered cars are a hot topic and widely debated. The pros, cons, issues and time frames can be talked about endlessly. An article by the Telegraph...

Variable Frequency Drive

Variable frequency drives are widely used to control the speed of ac motors.  This note looks at the mechanisms which enable drive units to control the...

How to Write an Electrical Note

Electrical notes are a collaborative collection of electrical engineering information and educational material. Any registered user can add content. ...

Three Phase Power Simplified

A single phase system is perhaps the most common type of system most people are familiar with. This is what people have in their homes and what appliances...

E-Ink

Before the technical, some general information. E-ink display are found in a lot of e-readers, some mobile phones and similar devices and the intent is...

Switchboard - Forms of Internal Separation

IEC 61439 'Low-voltage switchgear and controlgear assemblies', specifies standard arrangements of switchboard (call forms of internal separation). The...

Introduction to Cathodic Protection

If two dissimilar metals are touching and an external conducting path exists, corrosion of one the metals can take place.  Moisture or other materials...

Tip – Latitude and Longitude on Large Scale Plans

If you are working on a large plan, get the real coordinates [latitude, longitude] for two or more points and add them to the drawing. That way you can...

Have some knowledge to share

If you have some expert knowledge or experience, why not consider sharing this with our community.  

By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.

To get started and understand our policy, you can read our How to Write an Electrical Note