Generator Sizing & Operation Limits 

By on

When selecting a generator, there are inherent limits on the active and reactive power which can be delivered.  Generators are normally sized for a certain kW at a power factor of 0.8.  However, to understand the operation fully, it is necessary to look at the generator reactive power curve. 

Generator Operation

Generator Operating Curve
Generator Operation Area

When selecting a generator, there are inherent limits on the active and reactive power which can be delivered.  To illustrate this, the images show typical generator operation limits.

The smaller image depicts active power P, on the x-axis and reactive power Q, on the y-axis.  What would be considered the normal stable operating areas for a generator is shown in green.  As the generator operating point, measured in terms of active and reactive power , moves out of this region, operation become more unstable.

Generators are normally sized for a certain kW at a power factor of 0.8.  However, to understand the operation fully, it is necessary to look at the generator reactive power curve.  The image below shows similar information as the first image, but with more detail on where various limits apply.  Operation within the green area is pretty safe while operation in the red should be avoided.  Operation within the yellow is possible, subject to a detailed analysis being carried out..

 Generator Reactive Power Curve
Typical generator reactivate power curve

Generator operation for various levels of reactive power, both leading and lagging as shown. It can be seen that a stable operating region lies within a region of lagging power factor from 1 to 0.8.  As we move out of this region, we can start experiencing issues.   In particular leading power factors can result in unstable operation.  Low lagging power factors can result in rotor overheating.

Sizing of Generators

Sizing of generators can be carried out either by hand or using software.  For anything but the simplest systems, it is recommended to use manufacturers software so that a generator of adequate size is selected.

While software is often used, a good understanding of the variables which affect the size of a generator, will better ensure that the selected size of appropriate.  The key considerations are:

  • Loading of the generator - the total connected load has a direct bearing on the ultimate size of any generator.  This is probably where most people start in sizing a generator. 
  • Motor starting - starting of motors results in large current inrush and subsequent generator voltage drops.  Any generator needs to be sized such that the level of voltage drop still enables the motor to accelerate the load.  There is also short term heating on the generator during this period.  
  • Power factor - has a direct effect on the operation of the generator as discussed earlier.
  • Voltage and frequency -  sizing of generators needs to be carried out at the application voltage and frequency.  
  • Allowable voltage & frequency dips - unlike the grid, generators are not infinite (large) sources.  There will be voltage and frequency variations, and the generator needs to be sized to ensure these are below allowable limits.
  • Cyclic loading - loads which cycle, place varying demands on a generator.  Factoring these into the sizing model will help ensure that generators are not oversized. 
  • Non-linear loads - non-linear loads (UPS, VFD, etc.) generate high frequency harmonics, which can heat up the generator.  In addition, if lightly loaded, these can cause leading power factors. 
  • Other Considerations - in addition to the above; the type of fuel used, ambient temperature. Load shedding schemes and provision for future growth will all affect the final selected generator size.

In addition to being undersized, it is also possible to oversize generators.  At loads below 30%, generators can

During sizing a distinction will also be made between standby and prime generator sets.  Standby rated generators are typically based on a limited number of hours operation and have no overload facility.  Prime sets and run continuously at the rated load and do have periodic overload capability.

Types of Rating

  • Standby - these generators are used for supplying emergency power.  They have a limitation on running hours and no overload capability.
  • Prime - generators are used to continuously supply permanent power at variable load.  Typically they would also have the ability to deliver a 10% overload for one hour.,
  • Continuous - similar to prime, continuous generators are used to supply permanent power.  These would tend to be used to supply constant (non-varying) loads up to a fixed limit and do not have overload capabilities.


Steven McFadyen's avatar Steven McFadyen

Steven has over twenty five years experience working on some of the largest construction projects. He has a deep technical understanding of electrical engineering and is keen to share this knowledge. About the author

myElectrical Engineering

comments powered by Disqus



Autonomous Vehicle Challenge

Two driverless and solar power vans have departed from Italy on their way to China via the silk road. During the 13,000 kM trip the vans will drive themselves...

Earth Electrode Resistance

Earthing of electrical systems is essential for the correct functioning and the protecting of life and equipment in the event of faults.  The earth electrode...

Motor Starting - Introduction

Motor starting and its associated problems are well-known to many people who have worked on large industrial processes. However, these things are, of course...

International System of Units (SI System)

The International System of Units (abbreviated SI) is the world's most widely used system of units.  The system consists of a set of units and prefixes...

Cables for MV Power Distribution - Earthed versus Unearthed Systems

Power cables can basically be classified into earthed and unearthed cables, where earthed and unearthed refer to the application for which the cable is...

IEC Reference Designations

The IEC publishes a series of documents and rules governing the preparation of documents, drawings and the referencing of equipment.   Depending on country...

Are We Losing Professional Integrity

I have been thinking recently that there appears to be less professional integrity around than when I first started my career in electrical engineering...

RLC Circuit, Resistor Power Loss - some Modelica experiments

Modelica is an open source (free) software language for modelling complex systems. Having never used it before, I thought I would download a development...

Harmonised Cable Codes and Colours

Within Europe the European Committee for Electrotechnical Standardization (CENELEC) has standardised the both the designation and colour of cables.   ...

Network Theory – Introduction and Review

In electrical engineering, Network Theory is the study of how to solve circuit problems. By analyzing circuits, the engineer looks to determine the various...

Have some knowledge to share

If you have some expert knowledge or experience, why not consider sharing this with our community.  

By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.

To get started and understand our policy, you can read our How to Write an Electrical Note