From the category archives: Buildings Technology

Electrical and related buildings technology

8 Motor parts and common faults

By Steven McFadyen on 12/6/2011 6:07 AM

Straight forward list of some common motor faults.  If I have missed any other common faults, please take a bit of time to add them in as a comment below. read more..


How to Calculate Motor Starting Time

By Steven McFadyen on 11/15/2011 2:00 PM

Request to look at induction motor starting time have come up a few times on the site. Hopefully in this post, I give you guys some idea on how to calculate this. Failing that, hopefully at least som... read more..


Voltage Drop in Installations - Concepts

By Steven McFadyen on 9/27/2011 7:50 AM

Problems on achieving maximum voltage drop within an installation come up often. Depending where you live, local regulations will have different limits on maximum allowable voltage drop, however the int... read more..


8 Steps to Low Voltage Power Cable Selection and Sizing

By Steven McFadyen on 7/25/2011 2:48 AM

A recurring theme on our forums is cable sizing. Now many installations are unique and require special consideration. However, a lot of the time things are just repeated. When looking at low voltage pow... read more..


Maximum Demand for Buildings

By Steven McFadyen on 6/16/2010 5:42 PM

Estimating maximum demand is a topic frequently discussed. Working out how much power to allow for a building can be very subjective . Allowing too much power results in additional equipment, increased ... read more..


3 Phase Loads

By Steven McFadyen on 5/4/2010 12:56 AM

Three phase systems are derived from three separate windings, either connected in delta or star (wye). Each winding can be treated separately, leading to the idea that the load in each winding can be vi... read more..


LED Replacement Light Bulb

By Steven McFadyen on 4/13/2010 12:08 AM

The inventor of the first visible light-emitting diode makes history again this year as it begins to show customers a 40-watt replacement GE Energy Smart® LED bulb available later this year or early... read more..


Lightning Risk Assessment (IEC 62305)

By Steven McFadyen on 9/27/2009 11:18 PM

IEC 62305 'Protection against lightning' requires a risk assessment be carried out to determine the characteristics of any lightning protection system to be installed. There is a lot of hype about about... read more..


110 or 230 Volts

By Steven McFadyen on 8/2/2009 10:50 PM

I've been considering a blog on the 110 or 230 Volt issue for a while.  While browsing the Internet I came across a great summary by Borat over at  engineering.com.  He ... read more..


IEC 61439 - The Switchgear Standard

By Steven McFadyen on 7/1/2009 3:08 AM

The new standard IEC 61439 replaces the old 60439. Compared to the old standard, the new 61439 is a more clearly defined and takes into account the assembly of pre-tested designs. .

Some key... read more..


UPS Sizing - Rules of Thumb

By Steven McFadyen on 4/30/2009 12:56 AM

It wasn't so long ago I was telling someone that I don't use rules of thumb as most things are easily calculated anyhow.   As it turns out I last week I ended up using what can only be describ... read more..


Three Phase Current - Simple Calculation

By Steven McFadyen on 3/1/2009 11:47 AM

The calculation of current in a three phase system has been brought up on our site feedback and is a discussion I seem to get involved in every now and again. While some colleagues prefer to remember... read more..


Pages: Prev12NextReturn Top


Getting Started with Patents

If you have a great idea or invent something the last thing you want is someone to steal the idea. One of the things you can do is protect the intellectual...

Microsoft OneNote

A couple of months ago I came Microsoft's OneNote and downloaded the 60 day free trail. Since then I have been using it regularly and now have a full license...

Load Flow Study – how they work

A load flow study is the analysis of an electrical network carried out by an electrical engineer. The purpose is to understand how power flows around...

Periodic Electrical Installation Inspection – How Often?

How often installations are inspected is up to the owner of the installation, provided such durations do not exceed any regulatory maximums in force. ...

Magicians of Engineering

The other day I was reading 'Night of the New Magicians' by Mary Pope Osborn with my son.  The story is about a young boy and girl who travel back in time...

Cable Sizing Tool

Our cable sizing tool is one of the more popular tools on the site.  The tool enables cables to be sized in compliance with BS 7671 (the IEE Wiring Regulations...

Electrical Engineering

Electrical engineering is a field that covers a wide variety of sub-fields, including electricity and electronics. It is a field that goes back to the...

Surface Treatment – Ladders, Trays and Baskets

Steel ladders, trays and baskets form the backbone of cable containment systems. Often these items need some form of surface treatment to prevent corrosion...

Questions - Reputation and Privilege

Our question and answer system while letting you do exactly what it says, is much more.  It is a dynamic user driven system, where our users not only ask...

Dielectric loss in cables

Dielectrics (insulating materials for example) when subjected to a varying electric field, will have some energy loss.   The varying electric field causes...

Have some knowledge to share

If you have some expert knowledge or experience, why not consider sharing this with our community.  

By writing an electrical note, you will be educating our users and at the same time promoting your expertise within the engineering community.

To get started and understand our policy, you can read our How to Write an Electrical Note